10diazd's Stuff

Home » 10diazd (2 trails)
10diazd's Stats (public trails only):
Trails created: 2
Marks created: 8
Views received: 248
Positive ratings: 0
Negative ratings: 0
Comments received: 0
Comments left: 3
10diazd

10diazd's Trails
larimer avenue bridge TYPE OF CONSTRUCTION / DESIGN: Reinforced concrete open spandrel deck arch LENGTH OF MAIN SPAN: 300 ft 4 in [longest of its type in the world when opened] TOTAL LENGTH (including longest elevated ramp): 670 ft 50 ft wide HEIGHT OF DECK: 100 ft est
Tags: bridge, allegheny, arch, deck, larimer, ...
A trail of 3 pages
cost = $279 after sale
Tags: cost, theater, sale, universal, installation, ...
A trail of 5 pages